Click to Home
Go To Search
RSSPrintEmail
Street Division
City of Safford Street DivisionChip and seal at Dry Lake

Art Mata
Supervisor
Street Division

Ph: (928) 432-4197

Maintenance
The Street Division performs maintenance for approximately 41 miles of streets, 80 miles of parkways, 30 miles of sidewalks, 20 miles of alleyways and 20 miles of drainage systems.

Right of Way Permit Application must be completed any time traffic will be impeded or the City's Right-of-Way is being encroached upon.  Some examples included but are not limited to: roadway construction, utility work, driveways, landscaping, sign installation, sidewalks, and special events.

Once the Right-of-Way Application is completed, please fax (928) 428-7914 or email the application to .

The Street Division is responsible for the following areas throughout the City:

  • Alleyway and parkway maintenance, including weed control
  • Debris removal from roadways
  • Drainage systems
  • Patching
  • Renewal
  • Repair and overlay of existing roadway surfaces
  • Sealing
  • Sidewalk maintenance
  • Street sign maintenance
  • Striping street
  • Sweeping
  • Traffic control devices

Please contact ADOT at (928) 432-4900 for any issues on Route 70 or US Hwy 191, including traffic signals.